Business continuity and alternate site decisions involve a number of possible trade-offs. Depending on the budget to be made available or the flexibility possible in recovering operations for different sites, an alternate site policy can differ from one case to another. (more…)
Posts Tagged ‘Alternate Site’
Business continuity and alternate site location
Friday, October 28th, 2011Business Interruption – Water pipe burst evacuates 3500 from Sydney’s AMP Tower
Friday, February 25th, 2011A real life example of a business interruption incident today. A burst water pipe in the AMP Building in Sydney caused 3500 staff to be evacuated.
For the businesses without water damage, hopefully access can be restored and everyone is back to work on Monday morning. If any businesses sustained significant damage to their floor, it may be a while longer. This is an example of when having an alternate recovery site location ready to invoke may be necessary.
Read more on Sydney Morning Herald news.. http://t.co/DxhLGrO
Recommended considerations for selecting an Alternate Recovery Site
Friday, February 26th, 2010Do you need to select an alternate recovery site for your business continuity or IT disaster recovery?
In the event of a disaster, it is crucial that your organisation can transition as smoothly as possible into a recovery site and commence working on critical business processes as quickly as possible. Ensuring that an appropriate alternate recovery site has been selected is key to this smooth transition.
OpsCentre has released a succinct 2 page guide to considerations for selecting the right recovery site.
The report covers aspect such as:
- Location of the recovery site
- A list of must-have pre-requisites that every recovery site should have
- Site Security
- Technical Infrastructure considerations
- Other site characteristics to be considered
Go HERE to request your copy of the COMPLIMENTARY, OBLIGATION-FREE Alternate Site Selection Report.
What type of Business Continuity Recovery Site do you need?
Monday, January 11th, 2010The Recovery site is sometimes also referred to as the Alternate Site, Standby Site or Fallback Site.
Recovery sites can function purely as a standby data centre for your IT systems or they can be for business recovery as well, with desks, phones, desktop computers, meeting rooms and other facilities.
The data centre equipment and also the business recovery seats can be dedicated, by that meaning, totally reserved for your use only or shared, meaning first come first served in the event of a disaster. Which is why the ratio of clients to equipment is important as is the formula for how many clients from a given geographical area they subscribe to their ‘shared’ facility is as well.
One key decision when determining the most effective Business Continuity Strategy for an organization is the maximum readiness level of the recovery site (cold, warm, hot) that is required.
A cold recovery site is a facility that already has in place the environmental infrastructure required to recover critical business functions or information systems, but does not have any pre-installed computer hardware, telecommunications equipment, communication lines, etc. This scenario has the longest lead time to restoring live services because the equipment must be provisioned and setup after the event.
A warm recovery site is a site which is equipped with some hardware, and communications interfaces, electrical and environmental conditioning which is only capable of going live after additional provisioning, software or customization is performed, and the restoration of a database backup into the environment.
A hot recovery site is a facility that already has in place the computer, telecommunications, and environmental infrastructure required to recover critical business functions or information systems. Typically the organization’s data is synchronized to the hot site so that it can be switched across into live operation in a very short time, almost instantaneously in some instances. Because the data is mirroring at the data centre instantaneously or very frequently, the level of data loss in this scenario is usually minimal.
How to determine which type of recovery site is right for you?
Arising from your Business Impact Analysis, the Maximum Tolerable Outage for your business functions will give you the requirements by when the systems need to be up and running. The Recovery Point Objective, or the amount of acceptable data loss will help to inform these requirements as well. The right balance needs to be struck between the cost of the recovery solution and the cost of data loss, delays and downtime if you had to wait days or weeks to recover the systems.
This is why a wholistic, comprehensive Business Impact Analysis, involving the right business stakeholders and sponsored by Executive management is essential in order to determine the business continuity recovery strategy for your organization.
Choosing a Business Continuity Recovery Site
Wednesday, November 25th, 2009If an organization experiences a ‘denial of access’ or ‘loss of premises’ due to incidents such as extended power outage, flood or fire, an alternate location for critical business processes and staff needs to be established.
An Alternate Site is the premises to which a business unit may transfer its operations in the event of a business continuity incident. This is sometimes also known by the name Fallback Site or Recovery Site.
There are a number of different options that can be used as an Alternate Site depending on organization’s overall BCP strategy, recovery time frame requirements, budget etc. These are:
Commercial Recovery Site
In most capital cities there are organizations that provide both dedicated and shared recovery seats and some provide IT recovery infrastructure as well. Annual leasing fees are paid based on the number and type of seats required as well as for any IT equipment, storage of your IT equipment and other related services.
Internal Property Assets
Sometimes organizations may have other property assets which have vacant, underutilized or lower priority business functions housed there. These could be designated as an Alternate Site for a higher priority business function should the BCP need to be invoked. This is why it is important to have a clear prioritization of your business functions from the BIA as it will ensure lower priority business functions are vacated in the event of a significant business disruption to enable operations of a higher criticality to continue. It is also vital to have a displacement plan in place for the regular staff of the Alternate Site so everyone knows where they are going. Other considerations when planning how to use the displaced Alternate Site are transport, parking, seating, security access and IT requirements.
Telecommuting
Often staff are already geared up to telecommute and this does offer a low cost solution that suits many business functions. However there still needs to be a clear plan around which business functions are expected to telecommute and to ensure they have the resources such as IT equipment and remote access in order to do their jobs.
Vacant seats or displaced seats at a partner \third party organization
On some occasions there is a partner\third party organization that have capacity to house additional staff should the need arise. This may be a reciprocal arrangement. If an organization needs to rely on this type of arrangement it should be formalized and reviewed on a regular basis to ensure the seats are able to be made available should they be needed and to outline any commercial terms.
Commercial Serviced Offices
A commercial serviced office will certainly have the meeting room, seating and internet access required to get many people up and running initially. However, as this is a first-in first-served arrangement it is not recommended that this be relied upon as the sole recovery site for critical functions. If the serviced office is likely to be subject to increased demand from other organizations affected by the incident, you may not be able to get in as expected. It is still a useful contingency to have the contact details for some serviced offices both near the office and geographically separate as well. Hotels are also another option as they will typically have a business centre and meeting rooms.
In all instances it is best practice to maintain geographic distance between your primary site and your Alternate Site(s) in case there is a widespread incident affecting the general area of your primary site, for example, a large power outage. If your Alternate Site is too close, it may be affected as well.
Whichever type of Alternate Site is selected it is vital to include this as part of your regular Business Continuity and IT Disaster Recovery testing exercises to build staff familiarity and ensure that they can activate and function as you planned.


